When the pre-fab house people slap-up houses around here, they let the concrete base set for about 4 weeks before they put up the house....Surface of the block is not perfect and there are some small cracks, which are not deep.
Will let it dry for couple more days before doing something else.
They probably Estonians, they do everything very slow (I like jokes about my neighbors). But, seriously, I will do some angle grinding work tomorrow or day after tomorrow, and installation of the mount will take place only next week.people ...... around here
Did some dusty work today on the edges of the block..... 14 meters only
?? Why did you cover it ??After 2 days under polyethylene View attachment 95442 , removed the mould. View attachment 95443
Surface of the block is not perfect and there are some small cracks, which are not deep.
Will let it dry for couple more days before doing something else.
2 @Lazarus : same wife is still around. She was quiet angry to see this concrete block. I just wander what she will say after "small" antenna be installed on the block
No load about 3 days to walk on it, light load 15 days, heavy load 28 to 30 days, pre-stressed load 6 to 12 weeks, bridge supports 6 months.When the pre-fab house people slap-up houses around here, they let the concrete base set for about 4 weeks before they put up the house....
Not that this may transpose to your sat-plinth, but it does indicate that large plunths make take some time to cure...
That helped keep surface always wet and helps concrete to cure more evenly.?? Why did you cover it ??